REMBANG POWER PLANT, Indonesia
Description :
Engineering, procurement, construction and commissionin for complete coal handling system
Scope :
-
Total length of 4000m conveyor system for 2500tph coal handling
-
2 units of 2500tph Stacker Reclaimers
-
1 unit of 2500tph Ship Unloader
-
Other associated works and equipment

UONG BI POWER PLANT, Vietnam
Description : Engineering design for coal handling system
Client : Kawasaki Heavy Industries & Tsubakimoto
Scope :
-
Engineering design and consultation for a complete coal handling system for power plant
-
Technical support during consultation stage
.jpg)
PAROSENI POWER PLANT, Romania
Description : Engineering design for coal handling system
Client : Kawasaki Heavy Industries & Tsubakimoto
Scope :
-
Engineering design and consultation for a complete coal handling system for power plant
-
Technical support during consultation stage


KARCEMENT, Kazakhstan
Description :
Revamping of 27 Conveyer Systems for Existing Clinker Production Line 5 & 6
Scope :
-
Re-engineering, refurbishment, and modernization of complete conveyor systems
-
Total turnkey project consisting of engineering, procurement, construction and commissioining
LAMONGAN PORT, Indonesia
Description :
Design & Construction of Material Handling System for East Port Phase 1
Scope :
-
3 X 1500TPH conveyor systems for corn & soy handling
-
2 X 500TPH level luffing cranes
-
2 X transfer stations
-
1 X mobile tripper
-
Belt scales, dust suppression unit, diverter gates
-
Other associated works and equipment
LOCAL PROJECTS

VALE MINERALS MALAYSIA, Malaysia
Ongoing until 2024
Description :
M&E fabrication and installation works for upgradation and modernization of existing conveyor systems, ship unloaders and stacker reclaimers

LANGAT 2 WATER TREATMENT PLANT, Malaysia
Ongoing until 2025
Description :
Engineering, Procurement, Contruction & Commissioning for 2KM pipe conveyor handling sludge for the owner and operator of Langat 2, Ministry of Finance-owned Pengurusan Aset Air Berhad (PAAB), under Salcon Berhad.
This 2KM pipe conveyor represents a milestone in Tecgates Engineering EPCC capabilities as pipe conveyors are more complex to design and construct than regular belt conveyors.
Scope :
-
2KM pipe conveyors and related structures and components
-
4 intermediate stacking conveyors
-
Related electrical and instrumentation works

LEKIR BULK TERMINAL, Malaysia
Description :
EPCC for LEXPRO P1 Dedicated Bypass Conveyor
Scope :
-
Belt Conveyors 4 Units
-
Transfer Stations 3 Units
-
Fire Fighting System
-
Dust Suppression System
-
Metal detector 1 Unit
-
Other associated works and equipment

TANJUNG BIN POWER PLANT, Malaysia
Description :
EPCC for New Coal Unloading Jetty and Associated Bulk Material Handling System for Tanjung Bin Power Plant
Scope :
-
2 X Grab Unloaders
-
2 X Conveyor Systems
-
Extension to 3 units of existing conveyor systems
-
1 X Transfer Station
-
Other associated works and equipment
>>PROJECT PHOTOS

KUANTAN PORT, Malaysia
Description :
EPCC for New Coal Unloading Jetty and Associated Bulk Material Handling System for Tanjung Bin Power Plant
Scope :
-
2 X Grab Unloaders
-
2 X Conveyor Systems
-
Extension to 3 units of existing conveyor systems
-
1 X Transfer Station
-
Other associated works and equipment
>>SHIP UNLOADING ROLL OFF VIDEO

LHOIST LIMESTONE PLANT, Malaysia
Description :
EPCC for Conveyor Systems, Silos, and assorted Processing Equipment for Downstream and Truck Loading/Bagging System
Scope :
-
10 X Silos
-
2 X Bucket Elevators
-
1 X Vibrating Feeder
-
1 X Screw Conveyor
-
Other associated works and equipment

TNB JANAMANJUNG POWER PLANT, Malaysia
Description :
EPCC for Ash & Combustion Waste Disposal Handling System
Scope :
-
1 X Conveyor Systems
-
Other associated works and equipment

TANJUNG BIN POWER PLANT, Malaysia
Description :
Supply of 2000TPH Ship Unloader
Scope :
-
1 X Ship Unloader
-
Other associated works and equipment

TNB JANAMANJUNG POWER PLANT, Malaysia
Description :
EPCC for Coal Crushing and Coal Handling System
Scope :
-
6 units Conveyor System 3800TPH, Total 4KM
-
8 units Conveyor System 1400TPH
-
2 units Stacker Reclaimer 3800TPH/1400TPH
-
2 units Tripper Car 1400TPH
-
7 units Transfer Station
-
1 unit Banana type Screen 1400TPH (+/- 50mm)
-
1 Crusher 350TPH <50mm
-
Other associated works and equipment