top of page
Search
  • Writer's pictureTecgates

Interim Performance Certification Signing for Lexpro P1 project

On the 1st of October, representatives from Tenaga Nasional Berhad, their Lexpro project team, and the owner Integrax Berhad, together with their project engineer Tepsco, met with Tecgates Engineering for the interim performance certification signing for our project in Lekir Bulk Terminal for the bypass conveyor system.


Luminaries like Ir. Haji Azman, the MD of Integrax witnessed the signing between En. Mohd. Azmi, the acting MD at the time of the project implementation, together with Dr. Shamsul Amri, the project director for Lexpro, William Baker, TEPSCO consultant, and Mr. R.Ravichandran, the technical director for Tecgates Engineering.


Tecgates Engineering extends our thanks and appreciation to the professional and hardworking team at Lexpro, Lekir Bulk Terminal and Tepsco for their amazing effort, cooperation and guidance that, together with our experienced team at Tecgates Engineering, succeeded in delivering our project ahead of schedule.




342 views

Recent Posts

See All

Tecgates awarded maintenance contract in Kuantan Port

2nd May, 2019 – Tecgates Engineering was recently awarded a maintenance contract in Kuantan Port for the upkeeping of their coal and iron ore unloading system. Tecgates Engineering, which was also the

bottom of page